Verified companies

How do you choose and vet a renovation company in Luxembourg?

A reliable renovation company in Luxembourg holds a business permit (autorisation d’établissement), is entered in the Trade and Companies Register, has a current insurance certificate and provides a quote broken down item by item. Compare at least 3 quotes on the same scope, keep the deposit to 20 to 30% and have the 3% VAT approval requested before works start.

📊 The key figures
  • Business permit: mandatory for a craft business established in Luxembourg; ask for its number
  • 10-year liability insurance: liability set by the Civil Code, insurance not compulsory for the company: ask for the certificate
  • Quotes: at least 3, same scope; beyond 5 or 6, comparison stops making sense
  • Deposit: 20 to 30% on order is common practice, up to 50% for made-to-measure work
  • 3% VAT: approval requested by the company before works for any quote of at least €3,000 excl. VAT
  • Klimabonus: for a single element, an approved company or an energy advisor; beyond that, energy advice is mandatory

Where can you find a renovation company in Luxembourg?

Three set-ups coexist: a general contractor who handles everything, several tradespeople you coordinate yourself, or an architect who designs, consults the companies and supervises the works. The right choice depends on the number of trades and the time you can give to the project. To place this choice in the whole project (steps, budget, grants), see our guide to home renovation in Luxembourg.

Set-up Suited to Advantage Watch out for
General contractorFull renovation, many tradesOne contract, one contactKnowing who subcontracts what
Separate tradespeoplePartial renovation, 1 to 3 tradesDirect prices, your choice of each tradeYou manage the schedule and interfaces
Architect + companiesConversion, extension, building permitDesign, tendering, site supervisionFees of 8 to 15% of the works cost excl. VAT

Companies are found by word of mouth (with sites you can visit), through a matching platform such as renov.lu or through trade directories. Whatever the source, the same checks apply. To decide between an architect and a general contractor, see our comparison architect or general contractor. For interior works (floors, walls, painting, kitchen, bathroom), see also separate tradespeople or a general contractor for an interior renovation.

Which checks should you make before signing?

Five checks are enough and take less than half an hour: the business permit, the Trade Register, insurance, references and site organisation. A serious company provides all of this without argument.

1

The business permit

A craft business established in Luxembourg must hold a business permit (autorisation d’établissement) issued by the Ministry of the Economy (SMEs), linked to a place of business in Luxembourg. Ask for the number and the exact company name: a serious quote shows them.

2

The Trade and Companies Register entry

The Trade and Companies Register, kept by Luxembourg Business Registers (lbr.lu), shows the company’s legal form, registered office and managers. Check that the name on the quote matches the registered company.

3

Insurance

Ask for a current liability insurance certificate showing the insurer and policy number. For the roof, waterproofing, structure or an extension, also ask for the certificate covering 10-year liability: in Luxembourg this insurance is not compulsory for the company.

4

Recent, comparable references

Two or three jobs under 3 years old in Luxembourg, similar to yours, with a client contact. An old reference says nothing about today’s teams.

5

Who does what on site

In-house team or subcontractors, single point of contact, written schedule, frequency of site meetings. Subcontracting is fine if it is announced in writing and the company remains responsible.

Energy renovation: which company keeps you eligible for the Klimabonus?

The Klimabonus does not depend on a commercial label but on the procedure. For a single element (windows or facade, for example), the works must be carried out by a company approved under the law of 21 April 1993, otherwise an approved energy advisor supports the works; as soon as the renovation covers several elements or includes MVHR, energy advice is mandatory.

Project Who handles the file Approval in principle What the company must master
Single element (insulation or windows)Approved company, or energy advisor providing one-off supportBefore works, filed by the approved contractor or the advisorOne application and one invoice per measure; CONF-2026 confirmation form after works
Several elements or MVHRApproved energy advisor (renovation concept)Before worksFollowing the concept; airtightness test if MVHR
Heat pump aloneInstaller; no mandatory adviceNone: apply after installationHydraulic balancing, meters, noise level; acceptance request to the Chambre des Métiers within a month of commissioning
Pre-financing (heat pump and insulation: invoices from 1 January 2027; photovoltaics: already possible, through an installer listed in the Ministry of the Economy register)Company entered in the Environment Agency’s registerDepends on the measureDeducting the grant from the price excl. VAT, same amount as the standard procedure

The approval in principle is issued by the Environment Agency (Administration de l’environnement), not by Klima-Agence, which gives free advice (8002 11 90). Training schemes and labels offered to tradespeople by the Chambre des Métiers and Klima-Agence are a good sign of competence; above all, ask for proof of the approval your procedure requires.

📌 « Approved energy expert »: who is it?

Two roles are often confused. The approved energy advisor draws up the renovation concept and follows subsidised works: the advice is subsidised at €1,700 for a house (€2,000 if the approval in principle is requested before 30 June 2027). The energy performance certificate is issued by an architect or consulting engineer who is an OAI member, or by an expert approved by the Minister of the Economy, whose official list (version of 21 May 2026) is published on guichet.lu. Details on our energy advisor page.

How do you read and compare 3 renovation quotes?

Compare quotes on the same scope, line by line: three quotes are enough to place a price. A cheaper quote that leaves out removal, rubble disposal or finishes is not cheaper, it is incomplete, and the missing items come back during the works.

Quote item What you should find Red flag
IdentificationName, Luxembourg address, RCS number, business permit numberNo place of business
DescriptionDetailed items, quantities, areas, thicknessesLump sum
PerformanceBrand and reference; insulation R or U, window Ug, heat pump COP« Compliant insulation » with no value
LabourHours or days per item, hourly rateLabour merged into supplies
VAT3% or 17% rate, approval requested17% with no explanation
GrantsWho files the approval in principle and the confirmationSilence on grants
Timing and paymentStart date, duration, instalments tied to progress« As soon as possible », payments on fixed dates

VAT weighs heavily: on €30,000 of works excluding VAT, VAT is €900 at 3% against €5,100 at 17%, a €4,200 gap between two otherwise identical quotes. To place an hourly rate, see our tradespeople hourly rates comparison; for VAT conditions, the 3% VAT page.

Which warning signs should make you walk away?

Some signs justify dropping a company even if its price is the lowest: they point to lost grants, extras or no recourse.

Sign What it hides
No Luxembourg address, no permit numberUnauthorised activity, difficult recourse
Offer to start insulation or windows before the approval in principleKlimabonus lost for those works
Two-line quoteExtras during the works
17% VAT on an eligible homeVAT approval not requested
Insurance certificate missing or expiredNo cover in case of damage
Deposit above 30% for standard work, cash paymentRisk of losing the money paid
« Offer valid today only »Pressure to stop you comparing
Price far below the other two quotesMissing items or cut-price materials

Which deposit and payment schedule should you accept?

Practice in Luxembourg is a 20 to 30% deposit on order, payments tied to observed progress and a balance paid once snags are cleared; up to 50% on order is justified for made-to-measure items (joinery, kitchen). Example schedule: 30% on order, 30% mid-works, 30% at handover, 10% once snags are cleared.

  • Every payment against an invoice: the invoice carries the 3% VAT and supports the Klimabonus file
  • A 5 to 10% retention until snags are cleared, or a heating season for a heat pump: a practice, not a legal requirement, to be written into the contract
  • Every change by written amendment, priced before it is carried out
  • In the contract: description, price, timing, payment terms, insurance, VAT rate, waste disposal

How do you take over the works and use the guarantees?

Handover is the act that starts the guarantees: do it in writing, with a dated report signed by both parties listing the snags and the deadline to fix them, and pay the balance only once they are cleared.

  • Conformity: brands, models and outputs installed identical to the quote (rating plates)
  • Tests in your presence; for a heat pump, the hydraulic balancing report and proof of the acceptance request to the Chambre des Métiers
  • Documents: manuals, manufacturer warranties, detailed invoices, photos, Klimabonus confirmation form, post-works EPC if the file requires it

The Luxembourg Civil Code provides for 10-year liability for major works and 2-year liability for minor works (articles 1792 and 2270). Without insurance, this claim is made against the company itself, hence the importance of the certificate. See also construction warranties in Luxembourg.

What should you do in a dispute with the company?

Put everything in writing: a dated record with photos, a formal notice by registered letter setting a reasonable deadline, then mediation before court. The National Consumer Mediation Service (Médiateur de la consommation) handles disputes between consumers and professionals; failing agreement, the justice of the peace or the district court depending on the amount. Meanwhile, keep back the part of the balance that matches the snags: it is your best lever. If the company goes bankrupt, lodge your claim with the receiver appointed by the court.

How renov.lu forwards your quote request

Renov.lu is a quote platform: you describe your project once, we forward the request to companies established in Luxembourg whose business permit has been checked, and you receive 3 quotes, free and without obligation. Renov.lu does not rate or rank companies and is not party to the contract: the checks on this page remain useful for every quote you receive. To be put in touch directly, pick your trade on the page to find a verified tradesperson in Luxembourg.

Request quotes from renovation companies

Interior, energy or full renovation: describe the works in 2 minutes, receive comparable quotes and apply the grid above.

Compare companies established in Luxembourg

3 detailed quotes, free and without obligation.

Frequently asked questions about choosing a renovation company

How much does a general contractor cost?

A general contractor usually adds a coordination margin of 10 to 15% on top of the price of the individual trades (renov.lu survey, September 2026). In return, it signs a single contract, manages the schedule and is answerable for all the works; separate tradespeople cost less on paper, but the coordination is then up to you.

How do you check that a renovation company is authorised in Luxembourg?

Ask for the business permit number and the exact company name, then check that company’s entry in the Trade and Companies Register on the Luxembourg Business Registers website. The quote should show a place of business in Luxembourg and these references. If the company cannot provide them, do not sign.

Is 10-year liability insurance compulsory in Luxembourg?

Not for a building company. The Civil Code provides for 10-year liability for major works, but no law obliges the company to insure it, unlike architects and consulting engineers, who must be insured under the law of 13 December 1989. So before signing, ask for a current insurance certificate naming the insurer, especially for roofing, waterproofing or structural work.

What deposit can a renovation company ask for?

Common practice is 20 to 30% on order, then payments tied to observed progress and a balance once snags are cleared. Up to 50% is justified for made-to-measure joinery or a kitchen. Full payment before the end of the works, or payment in cash, is never normal.

Can a French, Belgian or German company renovate my home in Luxembourg?

Yes for occasional work, under the freedom to provide services, provided it completes the formalities required of foreign companies. To get 3% VAT, the company must charge Luxembourg VAT; an invoice with another country’s VAT cannot be refunded at the 3% rate. Klimabonus rules apply whatever the company’s nationality.

Who is the approved energy expert and when should you consult one?

The term covers two roles. The approved energy advisor draws up the renovation concept, mandatory for the Klimabonus as soon as more than one element is renovated. The expert who issues the energy performance certificate is an OAI architect or consulting engineer, or an approved expert on the official list published on guichet.lu. Consult them before requesting quotes.

How many quotes should you request for a renovation?

At least three, on the same scope, to place the market price and spot forgotten items. Beyond five or six, scopes diverge and comparison stops making sense. Allow 2 to 4 weeks to receive complete quotes, and give every company the same description of the works.

What if the company abandons the site or goes bankrupt?

Stop payments beyond the work actually done, have the state of the site recorded in writing and send a formal notice by registered letter. In a bankruptcy, lodge your claim with the receiver appointed by the court. A limited deposit, payments tied to progress and a retention until handover sharply reduce the loss.

  • Guichet.lu — Business permit for craft businesses (FR)
  • Luxembourg Business Registers — Trade and Companies Register
  • Guichet.lu — Klimabonus 2026: single-element renovation (approved company or advisor) (FR)
  • Guichet.lu — Klimabonus 2026: technical installations (FR)
  • Guichet.lu — List of experts for residential buildings (21 May 2026)
  • Guichet.lu — Housing VAT: direct application and refund (FR)
  • Legilux — Civil Code, articles 1792 and 2270
  • Legilux — Law of 13 December 1989 organising the professions of architect and consulting engineer (compulsory insurance for these professions)
This page gives objective checking criteria; it is not legal advice. Renov.lu does not recommend, rate or rank any company, is not party to works contracts and has no role in granting subsidies.