Municipal renovation grants in Luxembourg: how much does your commune pay in 2026?

In Luxembourg, 98 of the 100 communes top up the state Klimabonus with their own energy renovation grant, and the other 2 ask you to contact them. Most communes pay 10% to 50% of the state grant, often capped: in Luxembourg City, an air-to-water heat pump receives €12,000 from the state plus €6,000 from the City.

📊 Key figures (Klima-Agence simulator, data collected on 28 September 2026)
  • 98 of 100 communes pay a calculated grant for at least one item; Bettembourg and Mondercange offer grants but ask you to contact them
  • Form: in 81 communes, a percentage of the state grant, most often 10% (37 communes), 25% (23), 20% or 30% (7 each) and 50% (5); 5 communes pay flat amounts
  • Air-to-water heat pump: €500 to €6,000 in 84 communes (median €1,200), on top of the €12,000 Klimabonus; the commune’s cap applies in 51 communes
  • Facade insulation (100 m²): €500 to €3,500 in 87 communes, on top of €7,000 from the state
  • Solar PV (6 kWp): €250 to €2,871 in 93 communes, on top of €5,742 from the state
  • Most generous: Luxembourg City and Schifflange (€6,000 for an air-to-water heat pump), then Differdange (€5,000) and Steinsel (€4,000)
  • Stacking: commune grant + Klimabonus + Enoprimes + 3% VAT; the state’s increase until 30 June 2027 also raises commune grants calculated as a percentage

How much will you get in total?

The renov.lu simulator estimates the budget for your energy renovation and the state grants; add your commune’s row from the table below. You can then receive 3 free, no-obligation quotes from companies established in Luxembourg.

How do municipal grants for energy renovation work?

A municipal grant is an extra amount a commune pays from its own budget, on top of the state Klimabonus, for works carried out in the commune. There is no national scale: each municipal council votes its own regulation, which gives four ways of calculating the grant.

Calculation methodExample (standard project, September 2026)How common
Percentage of the state grantLuxembourg City: 50% of €12,000 = €6,000 for an air-to-water heat pumpMain rule in 81 communes
Capped percentageWincrange: 10% of the state grant, but no more than €1,200 for a heat pumpHeat pump capped in 51 communes
Flat amount per itemPétange: €500 for a heat pump, €1,000 for facade insulationMain rule in 5 communes
Amount per kWp (solar PV)Dippach: 6 kWp × €250 = €1,5005 communes (Dippach, Bettendorf, Biwer, Grevenmacher and Wormeldange)
“Contact your commune”A grant exists, but the amount is not calculated onlineAll items in Bettembourg and Mondercange; some items elsewhere

When the grant is a percentage, it follows the state grant. A heat pump ordered, or an approval in principle requested, before 30 June 2027 benefits from the state’s increase, and therefore from a higher commune grant: in Dudelange (25%), an air-to-water heat pump receives €3,000 from the commune with the increase and €2,500 without it.

The most common conditions, to check in your commune’s regulation:

  • works eligible for the Klimabonus: most communes calculate their grant from the state decision, so a file rejected by the state then gets nothing from the commune either;
  • a home located in the commune;
  • an application filed with the commune, within the deadline and on the form set by the regulation;
  • possible extra conditions: main residence, a cap per home or per period, a shorter list of items than the state’s.

The municipal regulation prevails: the Klima-Agence simulator gives the amount, not every condition. State amounts by type of work: 2026 grants and Klimabonus.

Commune grant, Klimabonus, Enoprimes and 3% VAT: what can be combined

The commune grant comes on top of the Klimabonus and does not replace it; in principle it can also be combined with the energy suppliers’ Enoprimes and the 3% VAT rate. For an air-to-water heat pump replacing an oil or gas boiler in a house, the layers stack up as follows:

GrantPaid byAmount for an air-to-water heat pumpWhen to apply
Klimabonus WunnenState (Environment Agency)€12,000 if ordered before 30 June 2027, €10,000 afterwardsAfter installation (no approval in principle for a heat pump)
Commune grantYour commune€0 to €6,000 depending on the commune (table below)Usually after the state decision
EnoprimesEnergy suppliers€1,700 to €2,500, plus a €1,000 bonus in 2026Before ordering
3% VAT instead of 17%Registration Duties, Estates and VAT Authority (AED)Benefit capped at €50,000 per homeApproval requested by the installer before the works
Social top-upMinistry of Housing10% to 100% of the Klimabonus depending on incomeWithin 2 years of the Klimabonus award

Some municipal regulations limit total public grants to the cost of the works: check this if your grants come close to the invoice. Heat-pump bonuses (oil tank, radiators, water protection zone): heat pump grants; solar PV and batteries: 2026 solar panel grants; reduced-rate conditions: 3% VAT on renovation works.

2026 municipal grants: table of the 100 communes

On the map, each commune is shaded by its grant for the selected item; the table below gives every amount.

Map of 2026 municipal grants in Luxembourg

Item shown
Map of Luxembourg: 2026 municipal grant for an air-to-water heat pump in each of the 100 communes, up to €6,000 in Luxembourg City and Schifflange

Hover over or tap a commune, or search for it by name, to see its three grants and how they are calculated.

Commune grant for this item (standard project): Air-to-water heat pump

  • €4,000 to €6,0004 communes
  • €2,000 to €3,60028 communes
  • €1,000 to €1,50030 communes
  • €500 to €75022 communes
  • On request from the commune11 communes
  • No grant for this item5 communes

Every amount, commune by commune: table of the 100 communes.

What the map shows: the grant that each of Luxembourg’s 100 communes adds to the state Klimabonus for a standard existing-house project (air-to-water heat pump replacing fossil heating, 100 m² of facade insulation, 6 kWp solar PV). 98 of the 100 communes pay a set amount for at least one item. Air-to-water heat pump: €500 to €6,000 in 84 communes (median €1,200), up to €6,000 in Luxembourg City and Schifflange. Facade insulation: €500 to €3,500 in 87 communes. Solar PV: €250 to €2,871 in 93 communes. Amounts include the state increase valid until 30 June 2027, except for solar PV. Sources: Klima-Agence simulator, survey of 28 September 2026; commune boundaries: Administration du cadastre et de la topographie (data.public.lu, CC0 licence). Map: renov.lu.

This table shows, for each of Luxembourg’s 100 communes, the commune grant calculated on 28 September 2026 by the official Klima-Agence simulator for the same standard project, on top of the state Klimabonus shown in the first row. On mobile, scroll the table to the right.

🏠 Standard project used for all 100 communes

Existing single-family house: air-to-water or ground-source heat pump replacing fossil heating; 100 m² each of facade and roof insulation with mineral insulation at the minimum standard; 20 m² of windows; energy advice for 2 elements; 6 kWp solar PV for self-consumption. Amounts include the state increase (order or approval in principle before 30 June 2027), except solar PV, which has no increase. Amounts rounded to the euro.

*: the commune’s cap applies. On request: the commune offers a grant, but the simulator refers you to it. —: no commune grant for this item in the simulator.

CommuneAir-to-water heat pumpGround-source heat pumpFacade insulation (100 m²)Roof (100 m²)Windows (20 m²)Energy adviceSolar PV (6 kWp)Main rule
State grant (Klimabonus)€12,000€14,000€7,000€7,000€1,600€2,700€5,7422026 flat rates, increased until 30/06/2027 (PV: no increase)
Beaufort€500*€500*€700€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €500
Bech€600*€600*€700€700€400€270on request10% of the state grant (10–25% by item); heat pump capped at €600
Beckerich€3,000€3,500€1,750€1,750€400€675€1,43625% of the state grant (25–50% by item)
Berdorf€600*€600*€700€700€400€270on request10% of the state grant (10–25% by item); heat pump capped at €600
Bertrange€3,000€3,500€1,750€1,750€400€675€1,43625% of the state grant
Bettembourgon requeston requeston requeston requeston requeston requeston requestAsk the commune
Bettendorfon requeston request€500€500€500—€300Flat amounts per item; PV: €50/kWp
Betzdorfon requeston requeston requeston requeston request€850*€1,43625% of the state grant (25–50% by item); other items on request
Bissen€3,000€7,000€1,750€1,750€400€2,025€50025% of the state grant (25–75% by item)
Biwer——€1,750€1,750€400€675€30025% of the state grant
Boulaide€1,200*€1,200*€700€600*€160—€1,250*10% of the state grant (10–25% by item); heat pump capped at €1,200
Bourscheid€1,200*€1,200*€700€600*€160—€57410% of the state grant; heat pump capped at €1,200
Bous-Waldbredimus€2,000*€2,000*€1,750€1,750€400€450*€1,43625% of the state grant; heat pump capped at €2,000
Clervaux€1,200*€1,200*€700€600*€160—€57410% of the state grant; heat pump capped at €1,200
Colmar-Berg€3,600€4,200€2,100€2,100€480—€1,72330% of the state grant
Consdorf€500*€500*€700€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €500
Contern€3,600€4,200on requeston requeston request€450*€1,72330% of the state grant; other items on request
Dalheim€1,000*€1,000*€700€700€160€225€57410% of the state grant; heat pump capped at €1,000
Diekirchon requeston requeston requeston request——€1,14820% of the state grant; other items on request
Differdange€5,000*€5,000*on requeston request€800€500*€2,87150% of the state grant; heat pump capped at €5,000; other items on request
Dippach€1,500€1,500€1,400€1,400€320€300*€1,50020% of the state grant (20–25% by item); heat pump: flat €1,500
Dudelange€3,000€3,500€1,750€1,750€400€200*€1,43625% of the state grant
Echternach€500*€500*€700€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €500
Ell€3,000€3,500€1,750€1,750€400€675€1,43625% of the state grant (25–50% by item)
Erpeldange——€700€700€400€250*€1,000*10% of the state grant (10–25% by item)
Esch-sur-Alzette€750*€750*€1,400€1,400€800€540€57420% of the state grant (10–100% by item); heat pump capped at €750
Esch-sur-Sûre€1,200*€1,200*€700€600*€160—€1,250*10% of the state grant (10–25% by item); heat pump capped at €1,200
Ettelbruck€1,200€1,400€700€700€160€250€57410% of the state grant
Feulen€1,000*€1,000*€700€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €1,000
Fischbach€500*€500*€700€500*€400€250*€500*10% of the state grant (10–25% by item); heat pump capped at €500
Flaxweiler€1,000€1,000€1,000*€1,000*———Capped amounts per item
Frisange€3,600€4,200€1,400€1,400€320€1,350€1,72320% of the state grant (20–50% by item)
Garnich€750*€750*€700€700€400€250*€57410% of the state grant (10–25% by item); heat pump capped at €750
Goesdorf€1,200*€1,200*€700€600*€160—€1,250*10% of the state grant (10–25% by item); heat pump capped at €1,200
Grevenmacheron requeston requeston requeston requeston request€750*€600Capped amounts per item; PV: €100/kWp; other items on request
Grosbous-Wahl€3,000€3,500€1,750€1,750€400€675€1,43625% of the state grant (25–50% by item)
Habscht€600*€600*€700€700€400€270€1,200*10% of the state grant (10–25% by item); heat pump capped at €600
Heffingen€500*€500*€500*€500*€160€250*€500*Capped amounts per item; heat pump capped at €500
Helperknapp€1,000€1,000€1,000*€750*€400—on request25% of the state grant; heat pump: flat €1,000
Hesperangeon requeston requeston request€2,450——€2,01035% of the state grant; other items on request
Junglinster—€7,000€1,400€1,400€320€2,025€500*20% of the state grant (20–75% by item)
Käerjeng€1,000*€1,000*€1,000*€1,000*€400€540€1,000*Capped amounts per item; heat pump capped at €1,000
Kayl€3,000€3,500€1,750€1,750€400€200*€1,43625% of the state grant
Kehlen€500*€500*€700€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €500
Kiischpelt€600*€600*€700€600*€160—€57410% of the state grant; heat pump capped at €600
Koerich—on request€1,000*€1,000*on request—€1,650*Capped amounts per item
Kopstal€1,000*€1,000*€700€700€400€250*€2,000*10% of the state grant (10–25% by item); heat pump capped at €1,000
Lac de la Haute-Sûre€1,200*€1,200*€700€600*€160—€1,250*10% of the state grant (10–25% by item); heat pump capped at €1,200
Larochette€500*€500*€700€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €500
Lenningen€2,400€2,800€1,400€1,400€320€540€1,14820% of the state grant
Leudelange€2,500*€2,500*————€1,43625% of the state grant; heat pump capped at €2,500
Lintgenon requeston request€1,000*€1,000*€600*on request€1,650*Capped amounts per item; other items on request
Lorentzweiler€500*€500*€1,000*€1,000*€400€300*€57425% of the state grant (5–25% by item); heat pump capped at €500
Luxembourg (City)€6,000€7,000€3,500€3,500€800—€2,87150% of the state grant
Mamer€3,600€4,200€2,100€2,100€480€810€1,72330% of the state grant
Manternach€3,000€3,500€3,500€3,500——€1,60050% of the state grant (25–50% by item)
Merschon requeston request€1,000*€1,000*——on requestCapped amounts per item; other items on request
Mertert€1,000*€1,000*€700€700€160€650*€57410% of the state grant (10–25% by item); heat pump capped at €1,000
Mertzig€500*€500*€700€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €500
Mondercangeon requeston requeston requeston requeston requeston requeston requestAsk the commune
Mondorf-les-Bains€1,000€1,000€1,000€1,000€1,000€249€1,436Flat amounts per item
Niederanven€2,500*€4,000*€3,500€3,500€800€750*€2,87150% of the state grant; heat pump capped at €2,500
Nommern€500*€500*€700€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €500
Parc Hosingen€1,200*€1,200*€700€600*€160—€57410% of the state grant; heat pump capped at €1,200
Pétange€500€500€1,000€1,000——€1,250*Flat amounts per item
Préizerdaul€3,000€3,500€1,750€1,750€400€675€1,43625% of the state grant (25–50% by item)
Putscheid€1,200*€1,200*€700€600*€160—€57410% of the state grant; heat pump capped at €1,200
Rambrouch€3,000€3,500€1,750€1,750€400—€1,43625% of the state grant (25–50% by item)
Reckange-sur-Mess€1,000*€1,000*€700€700€400€300*€57410% of the state grant (10–25% by item); heat pump capped at €1,000
Redange€3,000€3,500€1,750€1,750€400€675€1,43625% of the state grant (25–50% by item)
Reisdorf€500€500€500€500€500—€500Flat amounts per item
Remich€1,500*€1,500*€1,500*€1,500*€400€675€1,43625% of the state grant; heat pump capped at €1,500
Roeser€3,000€3,500€1,750€1,750€400€200*€1,43625% of the state grant
Rosport-Mompach€500*€500*€1,000*€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €500
Rumelange€750*€750*€1,400€1,050€400€200*€250*15% of the state grant (10–75% by item); heat pump capped at €750
Saeul€3,000€3,500€1,750€1,750€400€675€1,43625% of the state grant (25–50% by item)
Sandweiler€3,600€4,200————€1,72330% of the state grant
Sanem€1,500*on request————€1,500*Capped amounts per item; heat pump capped at €1,500
Schengen€1,000€1,500€2,000€1,000€1,000—€1,436Flat amounts per item
Schieren€1,000*€2,000*€1,000*€1,000*€400€500*€1,000*Capped amounts per item; heat pump capped at €1,000
Schifflange€6,000€6,000*€3,500€3,500€800€1,000*€2,87150% of the state grant
Schuttrange€3,600€4,200€2,100€2,100€480€810€1,72330% of the state grant
Stadtbredimus€3,000€3,500€1,750€1,750€400€675€1,43625% of the state grant
Steinfort€2,400€2,800————€1,14820% of the state grant
Steinsel€4,000*€6,000*€1,500*€1,500*€480€1,000*€86130% of the state grant (15–50% by item); heat pump capped at €4,000
Strassen€3,000€3,500€1,750€1,750€400€675€1,72325% of the state grant (25–30% by item)
Tandel€1,200*€1,200*€700€600*€160—€57410% of the state grant; heat pump capped at €1,200
Troisvierges€1,200*€1,200*€700€600*€160—€57410% of the state grant; heat pump capped at €1,200
Useldangeon requeston request€1,750€1,750€400€500*€2,000*25% of the state grant (25–50% by item); other items on request
Vallée de l’Ernz€500*€500*€500*€500*€400€250*€500*Capped amounts per item; heat pump capped at €500
Vianden€1,200*€1,200*€700€600*€160—€57410% of the state grant; heat pump capped at €1,200
Vichten—————€675€1,43625% of the state grant
Waldbillig€500*€500*€700€700€400€250*€1,000*10% of the state grant (10–25% by item); heat pump capped at €500
Walferdange€3,000*on request€2,100€1,500*€480€750*€1,72330% of the state grant; heat pump capped at €3,000
Weiler-la-Tour€2,500*€2,500*€1,000*€1,000*€480€250*€2,500*Capped amounts per item; heat pump capped at €2,500
Weiswampach€1,200*€1,200*€700€600*€160—€57410% of the state grant; heat pump capped at €1,200
Wiltz€1,200*€1,200*€700€600*€160—€1,250*10% of the state grant (10–25% by item); heat pump capped at €1,200
Wincrange€1,200*€1,200*€700€600*€160—€57410% of the state grant; heat pump capped at €1,200
Winseler€1,200*€1,200*€700€600*€160—€1,250*10% of the state grant (10–25% by item); heat pump capped at €1,200
Wormeldangeon requeston request€1,000*€1,000*—€250*€1,200Capped amounts per item; PV: €200/kWp

Beyond the table, the simulator also calculates pellet boilers (grant in 80 communes, €300 to €4,000), solar thermal (92 communes, €250 to €1,250), cellar ceiling insulation (85 communes), heat-recovery ventilation (33 communes, €500 to €4,500), batteries (10 communes with an amount, 88 refer you to the commune) and charging points (26 communes, €120 to €600). Select your commune in the simulator to see them.

Which communes pay the most for an energy renovation?

For an air-to-water heat pump, Luxembourg City and Schifflange pay the most: €6,000, i.e. 50% of the state’s €12,000, with no cap. To insulate the facade and roof (2 × 100 m²), Luxembourg City, Manternach, Niederanven and Schifflange pay €7,000.

Top 10: air-to-water heat pump (commune grant)

RankCommuneCommune grantMain rule
1Luxembourg (City)€6,00050% of the state grant
1Schifflange€6,00050% of the state grant
3Differdange€5,00050% of the state grant; heat pump capped at €5,000; other items on request
4Steinsel€4,00030% of the state grant (15–50% by item); heat pump capped at €4,000
56 communes tied : Colmar-Berg, Contern, Frisange, Mamer, Sandweiler, Schuttrange€3,60030% of the state grant

Top 10: facade and roof insulation (200 m²)

RankCommuneCommune grantMain rule
1Luxembourg (City)€7,00050% of the state grant
1Manternach€7,00050% of the state grant (25–50% by item)
1Niederanven€7,00050% of the state grant; heat pump capped at €2,500
1Schifflange€7,00050% of the state grant
5Colmar-Berg€4,20030% of the state grant
5Mamer€4,20030% of the state grant
5Schuttrange€4,20030% of the state grant
8Walferdange€3,60030% of the state grant; heat pump capped at €3,000
917 communes tied : Beckerich, Bertrange, Bissen, Biwer, Bous-Waldbredimus, Dudelange, Ell, Grosbous-Wahl, Kayl, Préizerdaul, Rambrouch, Redange, Roeser, Saeul, Stadtbredimus, Strassen, Useldange€3,50025% of the state grant

Communes with no grant or “on request”

No commune is missing from the simulator: 98 calculate at least one item, and Bettembourg and Mondercange refer you to their administration for every item. The gaps concern specific items:

  • Air-to-water heat pump: no commune grant in 5 communes (Biwer, Erpeldange, Junglinster, Koerich and Vichten), although Junglinster does support ground-source heat pumps; grant “on request” in 11 communes (Bettembourg, Bettendorf, Betzdorf, Diekirch, Grevenmacher, Hesperange, Lintgen, Mersch, Mondercange, Useldange and Wormeldange).
  • Facade insulation: no grant in 5 communes (Leudelange, Sandweiler, Sanem, Steinfort and Vichten), on request in 8.
  • Grants limited to a few items: Diekirch, Grevenmacher, Mersch, Sanem and Vichten calculate only 1 to 3 of the simulator’s 13 items.

Worked examples: state + commune + remaining cost in 4 communes

The same project in all four communes: a 1970s house replaces its oil boiler with an 8 to 12 kW air-to-water heat pump (€15,000 to €20,000 installed, 3% VAT included, per our heat pump cost page) and insulates 100 m² of facade from the outside with mineral wool (€150 to €220/m², i.e. €15,000 to €22,000, per our external wall insulation page). Order and approval in principle before 30 June 2027: the state pays €12,000 + €7,000 = €19,000. Total budget: €30,000 to €42,000.

CommuneCommune grant: heat pumpCommune grant: facadeTotal state + communeRemaining cost
Luxembourg City€6,000€3,500€28,500€1,500–€13,500
Esch-sur-Alzette€750*€1,400€21,150€8,850–€20,850
Differdange€5,000*on request€24,000€6,000–€18,000
Wincrange€1,200*€700€20,900€9,100–€21,100
  • Luxembourg City: the City adds 50% of each state grant, i.e. €6,000 for the heat pump and €3,500 for the facade; grants cover 68% to 95% of the budget.
  • Esch-sur-Alzette: the heat pump is capped at €750, but insulation receives 20% of the state grant (€1,400 for the facade); the city even pays 100% of the state grant for a cellar ceiling (€1,800 for 60 m²) and 50% for windows.
  • Differdange: 50% of the state grant, capped at €5,000 for the heat pump; for facade insulation the simulator refers you to the commune, so the total above only counts the heat pump.
  • Wincrange: the most common rule, 10% of the state grant (37 communes), with the heat pump capped at €1,200 and €700 for the facade.

Enoprimes not deducted: requested before ordering, they take a further €1,700 to €2,500 (plus the 2026 bonus) off the heat pump’s remaining cost. Beyond one element of the building envelope, energy advice is mandatory: it has its own state grant, and sometimes a commune grant (“Energy advice” column). Detailed budget for a full renovation: energy renovation costs.

How to apply for your commune’s grant

The commune grant is applied for at your municipal administration, usually once the state decision has been received, because most communes apply their percentage to the amount granted by the state. Five steps, in this order:

1

Read the municipal regulation before signing

Eligible items, percentage, caps, filing deadline, form: it is all in the commune’s regulation, published on its website (grants, subsidies or environment section) or available from the technical department. Some conditions apply before the works even start.

2

Follow the Klimabonus procedure

Approval in principle before the works for insulation, windows and ventilation; application after installation for a heat pump or solar PV. Order of forms and documents: Klimabonus steps.

3

Receive the state decision

The Klimabonus award decision sets the base amount for most commune grants: keep it with your invoices and proofs of payment.

4

File the application with the commune

Municipal form, copy of the state decision, paid invoices and bank details, plus any documents the regulation adds (for example proof of residence). Respect the commune’s deadline.

5

Receive the payment

The commune checks the file and pays the grant on its own schedule. If you hear nothing, follow up with the department that received the application.

To find your commune’s rules: its website, the Klima-Agence grants simulator (select the commune, then the works) and Klima-Agence’s free advice line on 8002 11 90. For the Klimabonus itself, the Guichet unique des aides au logement answers on 80 02 10 10.

Method, source and limits of this survey

The amounts on this page come from the official Klima-Agence simulator (aides.klima-agence.lu), queried on 28 September 2026 for all 100 communes with the same standard project, with and without the state increase. The table is generated automatically from these results, with no manual entry.

  • Checks: for each commune and item, the percentage is the same with and without the increase, the amount matches the simulator’s formula (percentage × state grant, flat amount, €/kWp or cap), and the increased grant is never lower than the base grant.
  • Amounts used: with the state increase where it exists; solar PV, batteries, pellets, solar thermal and charging points without an increase.
  • Limits: a commune can change its regulation at any time, and the simulator may lag behind; conditions (residence, deadline, cap per home or per year) are not modelled; “on request” means no amount is calculated online; the figures are for a house, not a flat.
  • What prevails: the municipal regulation in force when you apply.

Estimate your works and grants

Before choosing your works, put a figure on them: the renov.lu simulator estimates the budget and state grants, and your commune’s row in the table gives the top-up. To move on to quotes, a single request gets you 3 offers from companies established in Luxembourg. Overview of the works and their payback: energy renovation guide.

Your renovation, grants deducted

Insulation, windows, heat pump or solar PV: estimate the cost and grants in 3 minutes, then compare 3 free, no-obligation quotes.

Frequently asked questions about municipal grants in Luxembourg

Does my commune pay a grant for energy renovation?

Very probably: according to the Klima-Agence simulator (data collected on 28 September 2026), 98 of Luxembourg’s 100 communes calculate a grant for at least one item, and Bettembourg and Mondercange offer grants without calculating them online. The items covered vary: 84 communes support air-to-water heat pumps, 87 facade insulation and 93 solar PV. Find your commune in the table, then check its regulation.

Can the commune grant be combined with the Klimabonus and Enoprimes?

Yes: the commune grant comes on top of the state Klimabonus, and most communes calculate it from the Klimabonus amount (usually 10% to 50%). In principle it can also be combined with the energy suppliers’ Enoprimes, to be requested before ordering, and with the 3% VAT rate. Some regulations limit total grants to the cost of the works: check this if your grants come close to the invoice.

Do you have to wait for the Klimabonus decision before applying to the commune?

Usually, yes: a commune that pays a percentage of the state grant needs its final amount, and asks for a copy of the Klimabonus decision along with the invoices. The filing deadline is set by each municipal regulation: read it before the works, as some conditions apply from the outset.

Can a tenant receive the commune grant?

It depends on the municipal regulation. The commune grant usually follows the Klimabonus, which is requested by the person who commissions and pays for the works, most often the owner; the state does not require the owner to live in the home, so a landlord can apply. A tenant who pays for an installation, with the landlord’s written consent, should check whether their commune accepts them as the applicant.

In a co-owned building, is the commune grant paid per flat or for the building?

Each commune sets its own rule, and the amounts in the table are for a house. In an apartment building, the Klimabonus is calculated differently, for example €10,000 per dwelling for a shared air-to-water heat pump with the increase, and the co-ownership files its own forms (COLL-2026 and PROC-2026). A commune that pays a percentage in principle applies it to that amount, sometimes with a cap per building: ask the municipal department.

What happens to the commune grant after 30 June 2027?

It falls in communes that pay a percentage of the state grant, because the state increase ends for heat pumps ordered and approvals in principle requested after 30 June 2027. In Luxembourg City, the commune grant for an air-to-water heat pump will drop from €6,000 (50% of €12,000) to €5,000 (50% of €10,000); 26 communes are in this situation for heat pumps. Flat amounts and caps already reached do not change, unless the regulation does.

Why does the simulator say “contact your commune”?

Because the commune offers a grant for that item but its amount is not calculated online. This is the case for air-to-water heat pumps in 11 communes and for every item in Bettembourg and Mondercange. Call the commune’s technical or environment department, or Klima-Agence’s free advice line on 8002 11 90, before signing your quotes.

  • Klima-Agence — State and municipal grants simulator (all 100 communes, data collected on 28 September 2026)
  • Klima-Agence — Grant programmes and free advice (8002 11 90)
  • Legilux — Law of 24 July 2026 (Klimabonus Wunnen 2026-2030)
  • Government — Press release of 16 July 2026: increase until 30 June 2027
  • Guichet.lu — Klimabonus 2026: technical installations
  • Guichet.lu — Klimabonus 2026: energy renovation and energy advice
  • Guichet.lu — Housing VAT: super-reduced 3% rate
  • Enoprimes — Energy supplier grants (checked on 25 September 2026)
Commune grants calculated by the Klima-Agence simulator on 28 September 2026 for a standard existing-house project; they do not reflect each commune’s own conditions. Only the municipal regulation in force is binding. Example prices: market ranges from renov.lu cost pages (September 2026). Renov.lu does not process grant applications.